Project scheduling and earned value control for Python: CPM, PERT with Monte Carlo schedule risk, minimum-cost crashing, EVM and earned schedule. Validated against published reference values.
-
Updated
Jun 22, 2026 - Python
Project scheduling and earned value control for Python: CPM, PERT with Monte Carlo schedule risk, minimum-cost crashing, EVM and earned schedule. Validated against published reference values.
MCP server exposing pmcontrols (CPM, PERT, crashing, EVM, earned schedule) as validated tools for AI agents.
Weekly Plan vs Actual dashboard for engineering/construction projects. Power BI (DAX/modeling), variance hotspots and a simple pace index. Demo data included.
AI-powered project management platform for construction — docs, roadmap, and community
End-to-end residential construction estimating workflow including quantity takeoff, BOQ, contractor pricing, cost-loaded scheduling, Earned Value Management (EVM), commercial reporting, and project controls.
Python tool for Earned Value Management (EVM) analysis on infrastructure projects — CPI, SPI, EAC calculations with automated dashboard output
RiskPulse — AI-Driven Project Risk Manager A PMP-aligned web application for quantitative project risk analysis. RiskPulse utilizes Beta-PERT Monte Carlo simulations, Critical Path Method (CPM) scheduling, and Earned Value Management (EVM) to proactively identify bottlenecks, slippage, and resource contention in real-time.
Portfolio-ready Python analytics platform for aerospace quality risk management, combining risk scoring, EVM metrics, quality-control insights, FastAPI, and Streamlit dashboards.
WSQ PMP 35 PDU courseware aligned to the PMI Examination Content Outline (July 2026): a 545-slide deck, Lesson Plan, Learner Guide and 24 hands-on labs built on one continuous case study, covering People 33% / Process 41% / Business Environment 26% plus sustainability and AI in project management.
Single-file offline IT Project Manager workspace for Fixed Bid, Agile Scrum, and Hybrid projects with Gantt, sprint board, budget, RAID, reports, charts, and AI-style prediction.
Project-controls assurance engine for P6, cost, change, and risk data with reproducible evidence.
Phase-gated capital-program-controls dashboard — 20 derived KPIs across cost, schedule, risk, change, delivery & compliance, each with formula, threshold, and playbook. Zero dependencies, 1,846 tests, dual-stack (JS + SQL) parity proof.
Generate Excel S-curve and Earned Value project-control workbooks from progress CSVs. Live formulas, planner conventions, and documented Excel chart gotchas.
EVM + ML pipeline on 1,300+ infrastructure tasks — detecting 60.1-day optimism bias and forecasting schedules with Random Forest (MAE 29.79 days)
5-stage pandas pipeline analysing 1,300 construction tasks across a $64.4M portfolio — risk scoring, EVM, critical path flagging & automated reporting
Post-award contract portfolio management dashboard. Computes EVM proxy metrics (burn rate, CPI, EAC, schedule variance), classifies contract health across six states, and projects final cost at current burn rate before a budget ceiling is breached.
Local-first project controls desktop app for schedule, cost, risk, change and weekly management reporting.
Three project management case studies - business case development, Earned Value Management (CPI/SPI), and qualitative risk assessment for an ERP rollout.
Standalone Critical Path Method network diagram maker (GitHub Pages ready)
15 interactive project management charts built as a reference library, hosted on GitHub Pages.
Add a description, image, and links to the earned-value-management topic page so that developers can more easily learn about it.
To associate your repository with the earned-value-management topic, visit your repo's landing page and select "manage topics."