Description
figure moves from created into managed, and platform's GitHub configuration is import-only again.
Caller
#312 creates overnightworks/figure through a created map that exists only until the repository does. After #312's apply, every plan of src/opentofu/github fails on #312's precondition ("a name in created that the listing holds"), so no other apply of the root runs until this lands. #312's body, "Change 2, the fold", is this item's contract.
What it builds
- In
src/opentofu/github/repositories.tf:figurejoinslocal.managedin its sorted place;created,declared, the six attributes set only for a key ofcreated, the precondition and the rewritten import comment go, and the comment reads again that an import of a name that does not exist fails the plan, so no repository is created. - In
src/opentofu/github/tests/repository_listing.tftest.hcl: every fixture gainsfigure(public, not archived, not a fork); the run platform's GitHub configuration creates overnightworks/figure #312 added forcreatedgoes. src/opentofu/github/tests/repository_creation.tftest.hclis deleted. The mechanism stays recoverable from git at platform's GitHub configuration creates overnightworks/figure #312's commit.
Proof
mise run github:testis green in CI.- Before the pull request, the builder runs
scripts/apply_github_settings.shon the lane's commit; it must exit 0 (no change): the import blocks namefigure, which the state already holds. - After the landing, the same plan from
origin/mainexits 0; it goes into this item's journal. No apply is needed.
Risk
Not material: the plan proves that nothing on GitHub or in the state changes.
Rollback: a revert brings created back, and every plan fails on its precondition again; so a revert is never the way back here, a fix forward is.
Done when
figureis inmanagedand in every listing fixture;createdand its wiring are gone; CI is green.- The plan before the pull request and the plan after the landing both exit 0, in the journal.
version = 1
now = "Cut on 09.11.2026 with #312, which creates figure and leaves every plan failing on its precondition until this fold lands."
next = "Dispatch the moment #312's apply has run: claim, fold, plan, pull request."
done_when = "figure is in managed and every listing fixture, created and its wiring are gone, CI is green, and the plans before the pull request and after the landing both exit 0."
scope = ["src/opentofu/github/repositories.tf", "src/opentofu/github/tests/repository_listing.tftest.hcl", "src/opentofu/github/tests/repository_creation.tftest.hcl"]
Metadata
Metadata
Assignees
Labels
No labels
Activity
platform's GitHub configuration creates overnightworks/figure (#332)
FlexOr2 commentedon Nov 9, 2026
Pre-PR plan: scripts/apply_github_settings.sh (plan only) on 45e3f7f, run by the operator on 09.11.2026, exited 0 with no change (all 16 managed repositories and 16 vulnerability-alert objects refreshed, figure among them). Pull request: #347.
FlexOr2 commentedon Nov 9, 2026
Journal, 09.11.2026: the plan after the landing. The operator ran
scripts/apply_github_settings.sh(plan only) in the primary checkout at origin/main cf37ca7 (PR #347's merge):No changes. Your infrastructure matches the configuration., exit 0. Both plans of the Done when exited 0; no apply was needed.