MGMT-24453: upgrade to golang 1.26#2171
Open
shay23bra wants to merge 1 commit into
Open
Red Hat Konflux / Red Hat Konflux / assisted-installer-controller-ds-main-on-pull-request
succeeded
Jun 4, 2026 in 18m 30s
Success
Red Hat Konflux/assisted-installer-controller-ds-main-on-pull-request has successfully validated your commit.
Details
- Namespace: assisted-installer-tenant
- PipelineRun: assisted-installer-controller-ds-main-on-pull-request-5bn78
Task Statuses:
| Status | Duration | Name |
|---|---|---|
| 🟢 Succeeded | 4 seconds | |
| 🟢 Succeeded | 15 seconds | |
| 🟢 Succeeded | 1 minute | |
| 🟢 Succeeded | 3 minutes | |
| 🟢 Succeeded | 8 minutes | |
| 🟢 Succeeded | 5 minutes | |
| 🟢 Succeeded | 8 minutes | |
| 🟢 Succeeded | 20 seconds | |
| 🟢 Succeeded | 36 seconds | |
| 🟢 Succeeded | 36 seconds | |
| 🟢 Succeeded | 36 seconds | |
| 🟢 Succeeded | 34 seconds | |
| 🟢 Succeeded | 34 seconds | |
| 🟢 Succeeded | 39 seconds | |
| 🟢 Succeeded | 20 seconds | |
| 🟢 Succeeded | 29 seconds | |
| 🟢 Succeeded | 27 seconds | |
| 🟢 Succeeded | 30 seconds | |
| 🟢 Succeeded | 2 minutes | |
| 🟢 Succeeded | 5 seconds | |
| 🟢 Succeeded | 34 seconds | |
| 🟢 Succeeded | 38 seconds | |
| 🟢 Succeeded | 35 seconds | |
| 🟢 Succeeded | 6 seconds | |
| 🟢 Succeeded | 29 seconds | |
| 🟢 Succeeded | 9 seconds | |
| 🟢 Succeeded | 17 seconds | |
| 🟢 Succeeded | 52 seconds | |
| 🟢 Succeeded | 1 minute | |
| 🟢 Succeeded | 11 seconds |
Loading