Skip to content

Add CTLV2 manual cooling start and end dates - #644

Open
stephanedupont wants to merge 1 commit into
john30:masterfrom
stephanedupont:add-ctlv2-manual-cooling-dates
Open

Add CTLV2 manual cooling start and end dates#644
stephanedupont wants to merge 1 commit into
john30:masterfrom
stephanedupont:add-ctlv2-manual-cooling-dates

Conversation

@stephanedupont

Copy link
Copy Markdown

Adds the missing CTLV2 manual cooling date registers:

  • Manual Cooling Start Date (0xda)
  • Manual Cooling End Date (0xdb)

Both registers are defined as read/write dates.

Empirically tested on a Vaillant CTLV2 / sensoCOMFORT with SW 0514 and HW 1104. Read values were verified against the physical controller. The end-date write was additionally observed directly from the official VR940F gateway and reproduced locally through ebusd. Both fields were successfully exposed through ebusd MQTT/Home Assistant and written back to the controller.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant