Skip to content

DAOS-18728 pool: test master baseline#17773

Draft
Nasf-Fan wants to merge 1 commit intomasterfrom
Nasf-Fan/DAOS-18728_t1
Draft

DAOS-18728 pool: test master baseline#17773
Nasf-Fan wants to merge 1 commit intomasterfrom
Nasf-Fan/DAOS-18728_t1

Conversation

@Nasf-Fan
Copy link
Contributor

Only for test.

Test-tag: osa,pr,rebuild

Steps for the author:

  • Commit message follows the guidelines.
  • Appropriate Features or Test-tag pragmas were used.
  • Appropriate Functional Test Stages were run.
  • At least two positive code reviews including at least one code owner from each category referenced in the PR.
  • Testing is complete. If necessary, forced-landing label added and a reason added in a comment.

After all prior steps are complete:

  • Gatekeeper requested (daos-gatekeeper added as a reviewer).

@github-actions
Copy link

Ticket title is 'pool_component::co_in_ver dump after rebuild may cause DTX leader election failure'
Status is 'In Progress'
https://daosio.atlassian.net/browse/DAOS-18728

@daosbuild3
Copy link
Collaborator

Only for test.

Test-tag: osa,pr,rebuild

Signed-off-by: Fan Yong <fan.yong@hpe.com>
@Nasf-Fan Nasf-Fan force-pushed the Nasf-Fan/DAOS-18728_t1 branch from 054a9c5 to 13c5483 Compare March 24, 2026 14:30
@daosbuild3
Copy link
Collaborator

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Development

Successfully merging this pull request may close these issues.

2 participants