TrenchNote — Field Guide

How to use TrenchNote on the job. No app to download — your phone camera and one sign-in are all it takes.

First time on this phone: sign in

The first time you open TrenchNote on a phone, it asks you to sign in. Use the crew login your PM gave you (or your own, if you have one). That's a one-time thing per phone — as long as the phone gets used now and then, it stays signed in.

If TrenchNote ever shows you the sign-in screen again, just sign back in with the same login — it'll drop you right back at whatever you scanned.

Moving a piece of equipment

Every tracked machine and tool has a QR sticker with a code printed under it. For trucks, forklifts, containers, and other fleet gear it's the company number already painted on the side (like P-138 or FL-16); smaller untagged tools get a short code like A001. If you ever type a code by hand, don't worry about capital letters — p-138 and P-138 both find the same thing.

  1. Point your phone camera at the QR code and tap the link that pops up.
  2. The page shows what the thing is and where it's supposed to be.
  3. Taking it somewhere? Pick the destination from the dropdown, put your name in the name box, and hit the big orange MOVE HERE button.
  4. Green checkmark = done. That's the whole job.

Type your name once — the phone remembers it after that.

Heads up: on sites where the PM has turned it on, logging a move off a site automatically emails that site's PM. That's the point — no more gear vanishing unannounced. Log honestly and nobody has to make angry calls.

Sticker too muddy or scratched to scan? Use the code printed under it: open TrenchNote in your browser, find that code on the dashboard list, and tap it. Same page.

Already in the app? Tap 📷 Scan at the top instead of switching to your camera — point it at the next tag and it opens straight away. (First time, your browser asks to use the camera — allow it.)

Hour meters and odometers

Some equipment pages — generators, lifts, trucks — show an extra box in the move form: "Hour meter reading?" (or "Odometer reading?").

  • You can always skip it. Leave it blank and the move works exactly like it always has. Nobody's move gets held up by a gauge.
  • Got ten seconds? Glance at the gauge, punch in the number (the keypad comes up), and tap 📷 if you want to snap the gauge itself — that photo is gold at billing time. Then hit MOVE HERE like normal.
  • Month-end walkdown, nothing's moving? Open the equipment page and tap "Record a reading (no move)". Number, optional photo, save.

If the number you enter is smaller than the last one on record, the app still saves it — it just flags it in the list. Fat-fingered it? Enter the right number as a new reading; the flag on the old one tells the office which entry to ignore. (Same rule as moves: never fix an old entry, add a correct one.)

Under the big location box you may also see "Charging to job …" — that's the job number this site's equipment time is billed to. If gear is sitting on a job it shouldn't be billed to, that line is the tell.

Inspections (harnesses, extinguishers, slings, monitors…)

Some gear is only legal to use until a date — and that date used to live on a paper tag. Now it's on the same page you scan.

Reading the badge. When gear has inspections set up, its page shows a colored box:

  • Red "DO NOT USE" — it failed its last inspection, was pulled from service, or an inspection is overdue. Don't use it, don't get creative. Tell your PM, or if you're the competent person, inspect it and log the result.
  • Yellow "due soon" — still fine to use, but an inspection comes due within two weeks. Good time to get it done.
  • Green — all inspections current. Go to work.
  • No box at all — this gear doesn't have inspections set up. Most equipment doesn't; that's normal.

Tap the box to see the list — what gets inspected, how often, when it was last done, and the full history.

Logging an inspection. On the gear's page, tap the badge (or 🛡 Inspections & certs), pick which inspection you did (or "ad-hoc" for a one-off check), tap pass / fail / removed from service, put your name on it, and take a photo — especially on a fail. The photo of the cut webbing or the dead gauge is what ends arguments later. The app will nag you once if you skip the photo on a fail, but it won't stop you — pulling bad gear from service matters more than the picture.

Works with zero bars, same as moves — it saves on the phone and sends itself when signal returns.

The red badge shows up before the move button on purpose. Whether you're allowed to use a thing beats where it sits. You can still move red-tagged gear (hauling a bad harness back to the shop is the right move) — you just can't miss that it's bad.

Same ledger rules as everything else: never fix an old inspection — log a new one. Fat-fingered a fail? Log the correct result as a new entry; the history keeps both and the story stays honest.

For PMs / safety folks: set up what a piece of gear owes under ⚙ Manage requirements on its page — a name ("Monthly visual"), how many days between inspections, and where the rule comes from. Starter templates are in docs/inspection-seeds.md, but set the intervals from your safety program — the app shows status, it isn't the program. The dashboard's Inspections panel lists everything red and yellow, worst first — that's your Monday-morning walk list. There's a CSV export of the whole inspection history at the bottom of the panel for audits.

Walking the yard (inventory check)

Doing a walk-through to see what's actually on site? Open 📷 Scan and set "I'm at:" to where you're standing. Now the camera stays on, and every tag you point at lands on a list:

  • Green ✓ — it's where the log says it should be. Keep walking.
  • Orange "ledger says…" — the log thinks it's somewhere else. You're looking at it, so you win: tap Move here and the record is fixed on the spot.
  • Red "not in the system" — that sticker isn't in TrenchNote. Tell your PM.

Scan the same tag twice and it just blinks — no double entries. Twenty tags in five minutes is normal.

Reading the equipment page

  • The big box is where the thing currently is, and how long it's been there.
  • RENTED in the corner means it's rental gear — the vendor's name is right there. Don't send a rental to another site without telling whoever manages the PO.
  • A brown SPOKEN FOR box means someone has dibs on this for an upcoming date. You can still move it — but you're taking it from that person, so call them first. Their name is in the box.
  • Tap 🕑 Move history to see everywhere this thing has been — each hop, who moved it, and when. Handy for "wasn't this at Northside last week?"

An amber In transit on Manifest #… box means a sender put the item on a truck and the receiving site has not confirmed it yet. The big location box still shows the last confirmed ledger location on purpose.

Calling dibs (reservations)

Need the machine for your pour next Thursday? On the equipment page, tap "Need this later? Reserve it", put in your name, the date you need it by (and when you'll give it back, if you know), and what it's for. Now everyone who scans that machine sees your claim.

Reserving doesn't lock anything — it just makes sure nobody takes it without knowing about you. If two people have dibs on the same machine, both claims show, earliest first — that's your cue to make a phone call, not the app's cue to pick a winner.

Closing out a claim:

  • Just moved the machine to whoever reserved it? The page asks "did this move hand it over?" — tap yes and the claim is done.
  • Don't need it anymore? Tap Cancel this claim on the claim itself.
  • A claim in red saying "release date passed" means someone kept it past when they said they'd let it go, and nobody's closed the claim. It stays red until someone does — if it's yours, deal with it.

Materials (pipe supports, fittings, anchor bolts…)

Stuff that comes by the hundred doesn't get individual stickers. Instead:

  1. Open TrenchNote and look at the MATERIALS list on the dashboard.
  2. Tap the material. You'll see how many are at each yard, warehouse, and site — straight from the log, counted every time you open the page.
  3. Truck arrived from the supplier? Leave the first dropdown on "New delivery", pick where it was unloaded, type how many, hit LOG MOVE. See "Taking a delivery" below — there's ten seconds more that will save somebody a five-figure argument next year.
  4. Hauling 40 supports from the yard to your site? Pick the yard as "From", your site as "To", type 40, log it.
  5. Installed it or used it up? Pick where it came from, choose "Used / consumed" as the destination, type how many. It comes off the count but stays in the log forever. Put where it went in the note ("clarifier weir, bay 2") — future you will thank you.

The page shows how many the log says are at the "From" spot. If that number looks wrong compared to what's actually on the ground, tell your PM — the fix is logging a correcting move, and it takes ten seconds.

If you log more than the app thinks is there, it asks you to confirm once. If the material really is in your hands, tap OK — you're right and the log is missing a delivery. The count goes negative until someone logs it.

If a spot ever shows a red negative number, that's the app telling you the log and the ground disagree — more left that spot on paper than ever arrived. Usually it's a delivery nobody logged. Log it now and the number goes right.

Moving a truckload (transfer manifests)

Use a manifest when one truck carries several assets or bulk materials between two TrenchNote locations and the receiving site needs to check the load.

Sender:

  1. From the dashboard, tap Transfer manifest. Pick the source, destination, and type the driver's name.
  2. Add equipment from the list, or tap Scan asset tag and scan it. Add bulk materials with the quantity actually loaded. A gang box is one line — add the box, not every tool inside it; its contents travel with the box.
  3. Tap Dispatch truck. The manifest page is printer-friendly; tap Print manifest for the copy that rides in the cab. Save draft keeps it staged without calling it in transit yet.

Receiver:

  1. Open the manifest from Manifests in transit on the dashboard (or from the sender's link/paper reference).
  2. Work down every line. Leave the received number alone when it matches; change it when it does not. Type a plain note for anything short or damaged.
  3. Tap Confirm all received once. The signed-in receiving account is put on the manifest, every movement is written together, and the status says received with discrepancies if any line was short.

Example: sent 40 supports, received 38. The source loses all 40, the receiving site gains 38, and 2 show at Missing in transfer until somebody finds and moves them. The app never calls a missing bundle “used/consumed.”

While the truck is moving, asset and material pages show in transit on Manifest #…. Their normal location/stock still shows the last confirmed ledger count until the receiver submits — both facts are labeled so nobody mistakes a guess for a receipt.

Taking a delivery

Material sits in the yard for a year or more before it gets installed. When something turns up missing at startup, whoever has proof wins the argument with the vendor — and the proof is made at the truck, not later.

When you pick "New delivery", the form opens a few extra boxes:

  • Photograph the packing slip before the driver leaves — every time. Tap the 📷 packing slip button and snap it right on the tailgate. That photo, with its date, is the whole ballgame in a dispute. The app will nag you in orange if you skip it — it'll still let you log the delivery, but do everybody a favor and take the picture.
  • Vendor and PO number — who delivered, and the PO it came against. Straight off the slip. Type it once, done.
  • Anything over, short, or damaged? Say it in the box, plainly: "Received 480 of 500 per slip; 2 crates damaged." Count what actually came off the truck, not what the slip promises.
  • Damage photos — crate crushed? Snap it. Up to eight pictures ride along with the delivery.

All of it shows up in the Delivery history on the material's page, and your PM can print the whole record — photos and all — from the receiving report link at the bottom to send with the claim.

No signal at the yard? Log it anyway, photos and all — it saves on the phone and sends itself when you're back in coverage, same as moves.

The dashboard

Open TrenchNote's main page in any browser to see, at a glance:

  • Every asset, grouped by where it is — tap any row to open its page.
  • Materials — totals on hand.
  • Spoken for — who has claimed what, and for when.
  • Recently moved — the last moves, who logged them, and how long ago.
  • Manifests in transit — open truck handoffs, oldest first.

The three rules

  1. If it moves, log it. Two taps at the truck beats an hour of phone calls next month.
  2. Never "fix" an old entry. Wrong move? Log a new one putting it right. The history is what saves us in vendor disputes.
  3. Put your name on it. Nobody's checking up on you — but "who moved this?" is the exact question this thing exists to answer.

No signal? It still works

TrenchNote keeps working with zero bars:

  • Scanning still opens the page, showing the last info this phone saw — with a banner telling you exactly how old it is. Old info is old; the banner keeps it honest.
  • Logging a move still works. It's saved on the phone, and a black "⏳ to sync" tag appears in the corner. When you're back in coverage, it sends itself (or tap the tag to send it now). Don't clear the browser or sign out while that tag is showing — that data hasn't reached the office yet.
  • Meter readings, deliveries, inspections, and transfer manifests work offline too — photos and all. They ride the same ⏳ queue as moves and send themselves when signal returns, keeping the date you actually did them.
  • The date that gets recorded is the day you did it, not the day it sent. Move something Friday afternoon in a hole with no bars, and it still sends Monday morning — but the record says Friday. That matters: the equipment timecard and the job billing come off these dates, and a Friday move logged as Monday would put the machine on the wrong job for the weekend. Where the two days differ, the equipment page shows both, like "Jun 26 · entered Jun 29" — the day it moved, then the day it reached the office.
  • The receiving phone must have opened the manifest while it still had signal before it can receive that manifest offline. The receiving site cannot see a brand-new sender manifest until the sender's phone reaches the server.
  • If the tag turns red, one of your saved moves couldn't be accepted — tap it, read why, and check with your PM before discarding anything.

When something's wrong

  • Page won't load and you've never opened TrenchNote on this phone: offline mode only knows what the phone has seen before. Open it once with signal and you're covered from then on.
  • "No asset found": the code was typed wrong, or the sticker belongs to gear that isn't in the system yet. Tell your PM.
  • Wrong email or password: logins are handed out by your PM — there's no sign-up button on purpose. Ask them for the crew login.
  • Wrong location showing: somebody moved it without logging (see rule 1). Log a move to where it actually is — that both fixes the record and timestamps the correction.