Merge pull request #1 from czxdev/copilot/rebase-main-to-abetlen-llam… #6
test.yaml
on: push
download-model
31s
build-macos-intel
8m 5s
Matrix: build-linux
Matrix: build-macos
Matrix: build-windows
Annotations
7 errors
|
build-linux (3.11)
Process completed with exit code 134.
|
|
build-linux (3.9)
The strategy configuration was canceled because "build-linux._3_11" failed
|
|
build-linux (3.9)
The operation was canceled.
|
|
build-linux (3.12)
The strategy configuration was canceled because "build-linux._3_11" failed
|
|
build-linux (3.12)
The operation was canceled.
|
|
build-linux (3.10)
The strategy configuration was canceled because "build-linux._3_11" failed
|
|
build-linux (3.10)
The operation was canceled.
|