Follow-up from PR #125 and review comment:
#125 (comment)
PR #125 is scoped to raw-material OPEX accounting, so the new GetLabor
documentation added during review was moved out of that branch.
Scope:
- Add NumPy-style documentation for
SimulationExec.GetLabor.
- Clarify the default wage
35 [USD/h], operating weeks 48 [week/yr],
and the worker/shift multipliers used in the current formula.
- Resolve whether the labor-cost TODO should be interpreted as hourly [1/h]
or per-shift [1/shift] accounting.
- Add original references or explicit assumption notes for labor constants.
- Preserve the bracketed unit convention in comments and documentation.
Follow-up from PR #125 and review comment:
#125 (comment)
PR #125 is scoped to raw-material OPEX accounting, so the new
GetLabordocumentation added during review was moved out of that branch.
Scope:
SimulationExec.GetLabor.35[USD/h], operating weeks48[week/yr],and the worker/shift multipliers used in the current formula.
or per-shift [1/shift] accounting.